Case Studies

UF and RO Implemented to Increase Capacity of Ion Exchange Demineralization System

After the City changed its water source, higher conductivity levels led to more frequent regeneration of this energy company’s existing mixed-bed demineralization system. To address this, UF and RO trailers were initially deployed as a temporary solution. As part of the permanent upgrade, Wigen supplied UF and RO skids with a capacity of 8 MGD, to be installed in the facility’s basement. This required an innovative, space-efficient design to minimize the plant’s footprint while ensuring the equipment fit within the basement constraints.

TREATMENT SYSTEM INFORMATION:
UF System:
-Capacity: 4 x 2.93 MGD UF  trains (N+1)
-Design Flux: 64.4 gfd
-Design Recovery: >95%
RO System:
-Capacity: 4 x 2 MGD trains
-Array: 24:12:6, 7M
-Design Recovery: 90%

Upgrade of Fertilizer Manufacturer’s High Purity System

WIGEN SCOPE OF SUPPLY:
-375 gpm second pass RO Skid (existing first pass)
-400 gpm Mixed Bed Demineralizer System including Regeneration Equipment

High Purity Water Treatment for Combined Cycle Power Plant

WIGEN SCOPE OF SUPPLY:
-220 gpm UF System
-132 gpm 2-Pass RO System
-125 gpm EDI System feeding existing Mixed Bed DI System

High Purity Treatment for Natural Gas Combustion Turbine Plant

WIGEN SCOPE OF SUPPLY:
-Pretreatment skid with Bag and Cartridge filters
-400 gpm single pass RO System
-Membrane Degasification and EDI Systems on common skid.